Possibility to link Preventive Maintenance (PM) Meter reading with Discrete Manufacturing Process in Oracle EAM (R12)

There isn't a synchronization between PM Schedule and duration time (or resource usage time) in finished Discrete Jobs

The PM Schedule is based on the entered meter readings (manually in Meter Readings form or by interface).  Usage rate (defined for meters) is used for PM Schedule calculations until the number of entered meter reading is less than "Number of Past Reading". After that, system calculates usage rate based only on entered meter readings